Recently Awarded Projects

Below are projects were recently awarded (or Streeter Associates is the apparent low bidder). If you have any questions about these projects, please call (607) 734-4151 and ask to speak to the Estimator that is handling the project that you are interested in. If you have any problems downloading the project documents, contact Rob Stanton at (607) 734-4151 extension 6354. Use the link to the right to see a list of projects that we are currently bidding.

Cornell University Botanic Gardens R. M. Lewis Education Center Renovation - APPARENT LOW
Description: 1. Provide new exterior ADA concrete ramp with railings and a new stone pathway. 2. Provide modifications to exterior steel stairs and paint. 3. Provide repairs and waterproof coating to existing roof gutter system. 4. Provide repairs and replacement of select exterior doors. 5. Provide repairs and repainting of exterior trim and windows. 6. Provide HVAC and electrical improvements in Mechanical Room.
Bid Due: October 17th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2
Project Estimator: Brian Paul x6367
Submit Quote to: Quotes@StreeterAssociates.com

Cornell University Carpenter Hall Phase 3 - Pending Contract
Description: 1. The project includes a partial interior and exterior renovation of Carpenter Hall, first floor and basement, including but not limited to: 2. Provide temporary partitions at work areas. Maintain proper egress at all times. 3. Demolish, remove, or salvage select existing construction. 4. Demolish existing multi-story metal stack shelving system, including but not limited too structural posts, integral floor construction and finishes, and associated mechanical and electrical systems. 5. Demolition includes hazardous materials abatement. 6. Provide structural steel framing, concrete slab on deck, concrete slab on grade, and other structural steel to accommodate new floor infills, housekeeping slab, new opening in existing construction for window, and a new interior ramp and stairs. 7. Provide new openings in existing construction for new windows. The work includes adjustment to exterior stone veneer façade, new cast stone sill panels, and poured concrete area wells to accommodate new intake/exhaust louvers. Excavate to accommodate the new area wells and footings. Restore all site conditions. Protect trees in the project area. 8. Provide new partitions and finishes, including flooring, wall and ceiling paint, and new acoustical ceiling tile and grid. Provide new room signage. Provide new rated glazed doors and frames and non-rated doors and frames, including access control. 9. Provide limited mechanical and plumbing work which includes, but is not limited to new mechanical piping, new sump pump, space heaters, and new interior and exterior floor drains and piping. 10. Provide new or adjust electrical systems in the project area required for a complete installation. This includes but is not limited to new LED lighting, adjustments to the Fire Alarm System, and power distribution. Install Owner provided electrical panels.
Bid Due: September 25th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1
Project Estimator: Devon Clark x6363
Submit Quote to: Quotes@StreeterAssociates.com

Upgrade Electrical Systems at Binghamton State Armory (OGS) - PENDING AWARD
Description: General Construction Contract Upgrade Electrical Systems at Binghamton State Armory located at 85 West End Avenue in Bingahamton, New York. OGS Project No. 47621-C. See project documents for details and scope of work.
Bid Due: September 18th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2
Project Estimator: Kyle Lorey x6362
Submit Quote to: Quotes@StreeterAssociates.com

Cornell University Myron Taylor Jane Foster Smoke Control System - PENDING AWARD
Description: 1. The Myron Taylor Jane Foster atrium will be modified to enable the installation of a smoke vent system. Work includes ceiling and roof structure modifications, sensors and controls, AHU installation, ductwork, lighting and repainting. 2. Installation of all specified equipment and systems that are required for proper operation of smoke control system including, but not limited to: Wiring, piping, sprinklers, sensors, ducting, structural steel, conduit, air handling units, roof vents, dog houses, roofing system, and safety systems.
Bid Due: September 5th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1
Project Estimator: Kyle Lorey x6362
Submit Quote to: Quotes@StreeterAssociates.com

NYS Fire Academy Provide Elevator Addition and Modernize Existing Elevator - PENDING AWARD
Description: Provide Elevator Addition and Modernize Existing Elevator at New York State Academy of Fire Science located at 600 College Avenue, Montour Falls, New York. OGS Project No. 46123-C. See project documents for details and scope of work.
Bid Due: July 31st at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2 |Addendum 3 |Addendum 4
Project Manager: Luke Brown x6384
Submit Quote to: Quotes@StreeterAssociates.com

Cornell University Johnson Museum of Art Addition Accessible Entrance - AWARDED
Description: Provide and retrofit the entrance of the Johnson Museum of Art Addition with an ADA compliant entrance, adding power operators to the entrance. Work includes replacement of the glazing system with a frame system to conceal the mechanical components of the ADA hardware, while maintaining the architectural integrity of the façade. All work must compliment and integrate with the building security and intrusion systems.
Bid Due: July 11th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1
Project Manager: Brian Edwards x6359
Submit Quote to: Quotes@StreeterAssociates.com

SUNY Alfred State College of Technology (SUCF) Renovate Agriculture Science Building - AWARDED
Description: SUCF Project # 221033-00. The work of this single bid project includes the gut demolition, envelope replacement and interior fit out of the approximately 54,000sf Agriculture Science Building, including the roof. The work includes, but is not limited to, brick envelope demolition and reconstruction, concrete slab demolition and removals, asbestos abatement, cutting and patching, concrete, masonry, structural steel, steel stairs, miscellaneous metals, railings, misc. carpentry, millwork, thermal protection, sealants, doors and frames, aluminum storefronts/entrances, hardware, finishes, acoustic wall/ceiling panels, wall coverings, ceilings, metal studs and GWB partitions, flooring, EPDM Roofing, roof pavers, site utilities, sitework, mechanical, electrical, fire protection and plumbing.
Bid Due: June 18th at 2:00PM
Project Drawings (Volume 1): Download
Project Drawings (Volume 2): Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2 |Addendum 3 |Addendum 4
Project Manager: John Mahon x6356
Submit Quote to: Quotes@StreeterAssociates.com

Cornell University Replace Roofing & Ventilation - Tower Road East Greenhouses SUCF #161038 - IN PROGRESS
Description: 1. Replacement of greenhouse roof system glass 2. Modifications to greenhouse roof structures 3.Replacement of greenhouse roof ventilation systems 4. Asbestos abatement associated with the removal of existing greenhouse roof systems 5. Electrical work to support greenhouse roof system replacement
Bid Due: March 26th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2
Project Estimator: Brian Edwards x6359
Submit Quote to: Quotes@StreeterAssociates.com

South Seneca CSD 2022 CIP Improvements - IN PROGRESS
Description: General Trades Contracts 103 and 104. Capital Improvements Project for work at Ovid Junior and Senior High School, Interlaken Elementary School, New Transportation Facility and Existing Transportation Facility. See project documents for details and scope of work.
Bid Due: January 18th at 2:30PM
Project Drawings (Volume 1): Download
Project Drawings (Volume 1): Download
Project Specifications (Volume 1): Download Project Specifications (Volume 2): Download Project Specifications (Volume 3): Download
Addenda:Addendum 1 |Addendum 2 |Addendum 3 |Addendum 4 |Addendum 5
Project Manager: Ian Tuttle x6372
Submit Quote to: Quotes@StreeterAssociates.com

Cornell University Replace Elevators - Morrison & Riley Robb Hall SUCF #161042 - IN PROGRESS
Description: 1. Morrison Hall - Passenger elevator replacements a. Replacement of two (2) five stop passenger elevators each within its own phase. b. Architectural, structural, mechanical, and electrical work associated with elevator replacement. c. Asbestos abatement required for elevator replacement. d. Smoke mitigation modifications within each elevator machine room. Smoke hatch installations to be completed prior to new elevator equipment placement. e. All applicable code updates. 2. Riley-Robb Hall - Passenger elevator replacement a. Replacement of one (1) five stop passenger elevator within its own phase. b. Architectural, structural, mechanical, and electrical work associated with elevator replacement. c. Asbestos abatement required for elevator replacement. d. Smoke mitigation modifications within elevator machine room. e. All applicable code updates.
Bid Due: January 18th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2
Project Estimator: Devon Clark x6364
Submit Quote to: Quotes@StreeterAssociates.com

Cornell VMC Linear Accelerator Replacement & Infrastructure Upgrades - IN PROGRESS
Description: Replace the existing Linear Accelerator located in Room C2289C of the College of Veterinary Medicine, including upgrading the associated mechanical, plumbing, electrical, and architectural elements. Upgrades will include a new AHU set on top of the roof, new conduit pathways between equipment, setting a new chiller and power conditioning unit the mechanical space below, and providing new casework and furniture within the radiation oncology suite (Rooms C2289, C2289A, C2289B, C2289C). Close coordination will be required between the Owner, Contractor/subcontractors, and the equipment vendor to ensure that delivery timelines are kept and equipment can be commissioned in the correct order.
Bid Due: January 16th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Pre-bid Meeting Minutes |Addendum 1
Project Manager: Brian Paul x6359
Submit Quote to: Quotes@StreeterAssociates.com

Waverly CSD Additions and Alterations - Phase 2 - IN PROGRESS
Description: General Construction Contract. The project will include additions and alterations to the Waverly Junior and Senior High School Building located at 440 Park Ave, Waverly, NY 14892. See project documents for details and scope of work.
Bid Due: December 12th at 3:00PM
Project Drawings (Volume 1): Download
Project Drawings (Volume 2): Download
Project Specifications (Volume 1): Download
Project Specifications (Volume 2): Download
Addenda: Addendum 1 | Addendum 2 | Addendum 3
Project Manager: Mark Stirpe x6357
Submit Quote to: Quotes@StreeterAssociates.com

City of Ithaca New Fire Station - IN PROGRESS
Description: Contract 01 - General Construction. The project consists of an approximately 13,400 square-foot new fire station located at 403 Elmwood Avenue, Ithaca, NY. See project document for details and scope of work.
Bid Due: September 21st at 2:00PM
Project Drawings: Download
Project Specifications (Volume 1): Download
Project Specifications (Volume 2): Download
Addenda: Addendum 1 | Addendum 2 | Addendum 3
Project Manager: John Mahon x6364
Submit Quote to: Quotes@StreeterAssociates.com

Cornell War Memorial Phase 2 Restoration - AWARDED
Description: The restoration includes a full masonry repair program, including replacement of decorative carved stone elements. The slate roof is scheduled for replacement including its flashing and rainwater collection and drainage. The concrete utility tunnel that forms the foundation for the cloister that runs between the two residential halls is in poor condition and requires extensive repairs. Also included in the scope is lighting and paving upgrades. The steps down to the plaza will be rebuilt and a new handrail will be installed.
Bid Due: September 6th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2 | Addendum 3
Project Manager: Josh Mosolf x6360
Submit Quote to: Quotes@StreeterAssociates.com

Chemung County WWTP Consolidation Project - IN PROGRESS
Description: General-Regional Contract (4A). Chemung County # RFB-2434. A. The Work is located at the Chemung County Sewer Districts Lake Street and Milton Street Wastewater Treatment Plants (WWTP) as well as at the proposed site of the Siphon Discharge and Flow Transfer Structure. The Lake Street WWTP is located at 1700 Lake Street, Elmira, New York, 14901. The existing Milton Street WWTP and future Regional WWTP is located at 600 Milton Street, Elmira, New York, 14904. The Siphon Discharge and Flow Transfer Structure is accessed from Luce Street DEC Boat Access east of Dunn Field. See project documents for details and scope of work.
Bid Due: August 11th at 1:45PM
Conformed Drawings (General): Download
Conformed Drawings (Demolition): Download
Conformed Drawings (Civil): Download
Conformed Drawings (Structural): Download
Conformed Drawings (Architectural): Download
Conformed Drawings (Insturmentation): Download
Conformed Drawings (Fire Protection): Download
Conformed Drawings (Plumbing): Download
Conformed Drawings (Process Mechanical): Download
Conformed Drawings (HVAC): Download
Conformed Drawings (Electrical): Download
Conformed Specifications (Volume 1): Download
Conformed Specifications (Volume 2): Download
Conformed Specifications (Volume 3): Download
Conformed Specifications (Volume 4): Download

Project Manager: Lloyd Friedah x6392
Submit Quote to: Quotes@StreeterAssociates.com