Recently Awarded Projects

Below are projects were recently awarded (or Streeter Associates is the apparent low bidder). If you have any questions about these projects, please call (607) 734-4151 and ask to speak to the Estimator that is handling the project that you are interested in. If you have any problems downloading the project documents, contact Rob Stanton at (607) 734-4151 extension 6354. Use the link to the right to see a list of projects that we are currently bidding.

Cornell University Sage Hall Foundation Waterproofing - APPARENT LOW
Description: 1. Excavate and remove existing waterproofing and drainage piping along the entire west side and wrapping around to the halfway point on the south side. Install new waterproofing and drainage board, new foundation drain piping, clean out and spillway; backfill, finish grading and seeding. 2. Remove existing concrete step, landing and sidewalk at west entrance. Replace with new granite steps. Remove existing south stair and salvage cheek walls for reuse. Provide new foundation to support steps and landing, install new stone steps and landing. Repair, reinstall and paint original iron handrails. 3. Excavate to expose existing tunnel structure and remove existing waterproofing and insulation. Remove, label and salvage existing stone veneer for reuse. Remove existing entrance doors, frame, transom, and hardware. Install new membrane waterproofing, drainage board and rigid insulation over tunnel. Install new foundation piping. Reinstall existing stone veneer, light, add new scuppers, install new doors, frame, transom, and hardware. Patch and repair exiting lower concrete sidewalk. 4. Install new macro fiber re-enforced concrete sidewalks.
Bid Due: May 1st at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1
Project Estimator: Don Rottmann x6361
Submit Quote to: Quotes@StreeterAssociates.com

Cornell University Replace Utilities Tower Road East Green Greenhouse - PENDING AWARD
Description: 1. Replace existing autoclave and associated utilities with new electric steam generated autoclave consisting of steam boiler and accessories. New RO skid shall be installed as shown on drawings to serve electric steam boiler. 2. Modifications to existing autoclave enclosure CMU walls and roof as specified on the drawings. 3. Electrical modifications to support new electric steam generated autoclave. SUCF #161046.
Bid Due: March 16th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2
Project Manager: Brian Edwards x6359
Submit Quote to: Quotes@StreeterAssociates.com

Cornell University Stimson Hall Egress Improvements - AWARDED
Description: Provide a second means of egress from Floors Two and Three by removing the existing exterior fire escape and constructing a new interior exit stair. The work area primarily consists of interior renovations on the east end of the existing building with localized wall partition and door modifications elsewhere to improve means of egress. The proposed stairway is enclosed with fire-resistant-rated construction from the second floor to the existing exit discharge on the first floor.
Bid Due: March 24th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1
Project Manager: Josh Mosolf x6360
Submit Quote to: Quotes@StreeterAssociates.com

Cornell University Wilson Lab Compliance Project Phase 1B - IN PROGRESS
Description: A. Project will provide a fire protection system for much of the existing Wilson Lab. This will include a new water service, wet and dry sprinkler systems, standpipes, fire department connections. B. Associated work to support the installation of the new fire protection system will include, but not be limited to - select demolition, partitions, doors, ceilings, finishes, firestopping, lighting, etc. C. The project will also provide a new coiling fire door, alterations to existing stairs (including relocation of non-compliant utilities within stairs), miscellaneous fire alarm work, and SCBA fill stations and signage in the synchrotron ring.
Bid Due: January 31st at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1
Project Manager: John Mahon x6356
Submit Quote to: Quotes@StreeterAssociates.com

SUNY Geneseo Merritt Hall Pool Renovation - IN PROGRESS
Description: Replace Pool Scupper Box and Deck Tile at SUNY Geneseo's Merritt Athletic Center. See projrct documents for details and scope of work.
Bid Due: December 6th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda: Addendum 1 | Addendum 2 | Addendum 3
Project Manager: Ian Tuttle x6372
Submit Quote to: Quotes@StreeterAssociates.com

SUNY Alfred (State) Water Treatment Bldg. and Elevated Storage Tank - IN PROGRESS
Description: The work of this single bid project includes construction of a new water treatment building, new elevated concrete water storage tank, and new pre-chlorination building. Replace underground utilities and structures, an provide regrading, concrete pavement, asphalt pavement, and plantings.
Bid Due: August 3rd at 2:00PM
Project Drawings: Download
Project Specifications (Volume 1): Download
Project Specifications (Volume 2): Download
Addenda:Addendum 1 |Addendum 2
Project Manager: John Mahon x6356
Submit Quote to: Quotes@StreeterAssociates.com

Odessa-Montour CSD Pool Renovation (2019 Capital Project) - IN PROGRESS
Description: General Construction Contract. 2019 Capital Construction Project. Pool Renovation for Odessa Elementary and High School (SED #55-01-01-04-0-001-019) 300 College Avenue, Odessa, New York 14869. Please see project documents for details and the scope of work.
Bid Due: September 9th at 3:30PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2 |Addendum 3
Project Manager: Brian Edwards x6359
Submit Quote to: Quotes@StreeterAssociates.com

Cornell Balch Hall Concrete - IN PROGRESS
Description: Please use the link below to access all Plan and Spec Documents, as well as all current Bulletins and RFi Responses.
ALL UPDADTED PROJECT DOCUMENTS: HERE
Project Manager: Brian Edwards x6359
Submit Quote to: Quotes@StreeterAssociates.com

Chemung County WWTP Consolidation Project - IN PROGRESS
Description: General-Regional Contract (4A). Chemung County # RFB-2434. A. The Work is located at the Chemung County Sewer Districts Lake Street and Milton Street Wastewater Treatment Plants (WWTP) as well as at the proposed site of the Siphon Discharge and Flow Transfer Structure. The Lake Street WWTP is located at 1700 Lake Street, Elmira, New York, 14901. The existing Milton Street WWTP and future Regional WWTP is located at 600 Milton Street, Elmira, New York, 14904. The Siphon Discharge and Flow Transfer Structure is accessed from Luce Street DEC Boat Access east of Dunn Field. See project documents for details and scope of work.
Bid Due: August 11th at 1:45PM
Conformed Drawings (General): Download
Conformed Drawings (Demolition): Download
Conformed Drawings (Civil): Download
Conformed Drawings (Structural): Download
Conformed Drawings (Architectural): Download
Conformed Drawings (Insturmentation): Download
Conformed Drawings (Fire Protection): Download
Conformed Drawings (Plumbing): Download
Conformed Drawings (Process Mechanical): Download
Conformed Drawings (HVAC): Download
Conformed Drawings (Electrical): Download
Conformed Specifications (Volume 1): Download
Conformed Specifications (Volume 2): Download
Conformed Specifications (Volume 3): Download
Conformed Specifications (Volume 4): Download

Project Manager: Lloyd Friedah x6392
Submit Quote to: Quotes@StreeterAssociates.com

SUNY Geneseo Sturges Hall - Abatement and Replace Windows - IN PROGRESS
Description: SUCF Project No 061016-01 (Single Prime). The main features of the work includes removing existing window, frame, trim and hardware as noted on the drawings to install new premium aluminum clad wood windows to match existing window divisions and profiles. Removal of existing elevator and installation of new aluminum framed skylight. Abatement work as demolition to Remove existing plaster from masonry backup. Replace existing clay speed tile with new as required after plaster removal. Removal of existing walls and ceilings as noted on the drawings. Patch and repair existing wall and adjacent finishes to remain to match existing. Patch and repair floor substrate to receive new floor in future project. Removal of all existing drop ceilings. Removal of existing floor finish as noted on the drawings. Patch and repair floor substrate to receive new floor in future project. Remove existing interior door, frame, trim, and hardware as noted on the drawings. Carefully remove existing historic wood clocks and turn over to the college for storage. Removal and replacement of existing roof drains and leaders. Install new metal flashing coating system at gutter. Removal and replacement of Main Stair Tower EPDM roof. Repair existing concrete areaways and remove and replace metal grates. Clean existing exterior limestone and granite. Patch incidental areas of loose material at all elevations. Repoint existing exterior brick. Replace damaged exterior brick with replacement brick of similar color and size. Repoint existing exterior limestone and granite. Removal of existing mechanical, plumbing, fire protection and electrical systems as noted on the drawings and provide temporary heating, lighting and fire alarm to be left in place at completion of project.
Bid Due: July 26th at 2:00PM
Project Drawings: Download
Project Specifications (Volume 1): Download
Project Specifications (Volume 2): Download

Addenda: Addendum 1 | Addendum 2 | Addendum 3 | Addendum 4 | Addendum 5
Project Manager: Ian Tuttle x6372
Submit Quote to: Quotes@StreeterAssociates.com

Binghamton Armory Replace Windows and Roofs - IN PROGRESS
Description: General Construction Contract, OGS Project # 47182-C. Replace Windows and Roofs G, J, C and E at the Binghamton State Armory located at 85 West End Avenue, Binghamton, New York. See project documents for details and scope of work.
Bid Due: July 13th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:No Addenda
Project Manager: Lloyd Friedah x6392
Submit Quote to: Quotes@StreeterAssociates.com

OGS Provide Restroom and Locker Room Addition Maintenance, Headquarters - IN PROGRESS
Description: General Construction Contract (OSG Project# 45260C). Provide Restroom and Locker Room Addition Maintenance Headquarters, DOT Region 6, Schuyler County, 3545 County Route 16, Watkins Glen (Schuyler County), NY. See project documents for details and scope of work.
Bid Due: July 6th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2
Project Manager: Mark Stirpe x6357
Submit Quote to: Quotes@StreeterAssociates.com

Cornell Reconstruct CVM Equine Facilities (SUCF) - IN PROGRESS
Description: SUCF Project# 191017. 1. Construct a new equine facility east of the brood mare barn with associated site work, utility and septic work. The new facility will include a non-conditioned horse wing with 28 stalls, a wash stall, treatment area and storage. The Conditioned section will include offices, breakroom, a classroom, a small lab, restrooms and janitor's closet, and a mechanical space. 2. Demolish existing main barn after the new facility is operational and ready to house horses. 3. Construct new commodities barn on the site where the existing main barn was demolished.
Bid Due: June 16th at 3:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2 |Addendum 3
Project Manager: Josh Mosolf x6360
Submit Quote to: Quotes@StreeterAssociates.com

Cornell Phillips Hall 339A and 339B Lab Renovation - IN PROGRESS
Description: 1. The following Scope of Work is required to renovate Phillips Hall Lab 339A and 339B: a. Provide temporary partitions at work areas and maintain proper egress at all times. b. Demolish existing finishes, including flooring. Demolish existing doors and frames and select wall partitions. Demolish existing ceiling grid and tile, lighting, and other ceiling mounted devices or equipment in the project area. Demolish existing mechanical, plumbing, and electrical systems as indicated on the drawings. Protect existing finishes that are to remain. c. Provide new partitions, hollow metal doors (rated and non-rated), frames, and hardware, including access control. Provide new finishes, including flooring and wall and ceiling paint. d. Provide new overhead metal carriers and associated mechanical, electrical, and plumbing systems and utilities. Provide select equipment indicated on the drawings. e. Provide new mechanical, electrical (including LED lighting and controls), and plumbing systems and controls in the project area required for a complete installation. Provide fire protection system. f. Provide new slab and wall penetrations to accommodate ductwork installation. Provide roofing systems to accommodate new penetrations and equipment curbs/rails. g. Provide laser curtains and laser interlock system.
Bid Due: June 28th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2
Project Estimator: Nick Fabrizi x6364
Submit Quote to: Quotes@StreeterAssociates.com

CU West Campus Gothics Buildings Envelope Stabilization - IN PROGRESS
Description: Provide exterior masonry envelope and chimney stabilization. Provide shoring and stabilization of exterior site retaining walls. Barricade and restrict access to exterior site stairs. Provide repairs to exterior concrete sidewalks. Repair exterior stair railings.
Bid Due: May 24th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1
Project Manager: Brian Edwards x6359
Submit Quote to: Quotes@StreeterAssociates.com

Ithaca CSD District-Wide Capital Improvements - Phase 2 - IN PROGRESS
Description: General Construction (Contract 401). Reconstruction of Ithaca High School, Boynton Middle School, Dewitt Middle School, Belle Sherman Elementary, Belle Sherman Watson Annex, Caroline Elementary School and Enfield Elementary School. Additions and Alterations to Lehman Alternative Community School, and South Hill Elementary School. See project documents for details.
Bid Due: March 22nd at 4:00PM
Project Drawings (Volume 1): Download
Project Drawings (Volume 2): Download
Project Drawings (Volume 3): Download
Project Specifications (Volume 1): Download
Project Specifications (Volume 2): Download
Addenda:Addendum 1 |Addendum 2 |Addendum 3 |Addendum 4
Project Manager: Luke Brown x6384
Submit Quote to: Quotes@StreeterAssociates.com

Cornell University Rockefeller Hall Sprinkler System Replacement - IN PROGRESS
Description: 1. Replace the existing sprinkler system at Rockefeller Hall. 2. Provide architectural, mechanical, electrical, and fire alarm renovations to support the sprinkler system replacement.
Bid Due: February 22nd at 3:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2
Project Manager: John Jeter x6370
Submit Quote to: Quotes@StreeterAssociates.com

Cornell New Experimental Hall for CHESS - IN PROGRESS
Description: The New Experimental Hall (NEH) project includes the construction of a new +/-16,000 SF building to provide space for research involving a high magnetic field and x-ray beams, and associated support spaces. Site work includes but is not limited to demolition, abatement, utilities, storm drainage, paving, stairs and other hardscape, retaining walls, landscaping, lighting other improvements. The building structure and enclosure shall include foundations, walls, superstructure, enclosures. Interior construction includes carpentry, glazing, finishes, fire protection, plumbing, mechanical and electrical work .
Bid Due: January 26th at 3:30PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2 |Addendum 3 |Addendum 4 |Addendum 5 |Addendum 6
Project Manager: John Mahon x6356
Submit Quote to: Quotes@StreeterAssociates.com

Cornell Renovate CALS Greenhouses Phase 1 (SUCF) - IN PROGRESS
Description: 1. Construction of a 5,300 SF (approximate) Headhouse and associated site work for the College of Agriculture and Life Sciences (CALS) at Cornell University in Ithaca, New York.
2. The Headhouse will be load-bearing masonry and bar joist construction with metal siding, and includes Soil Mix Area, Work Area, Loading Dock, Office Space, Mechanical and Electrical Room, and Storage Room (the latter Room will be a Pesticide Spray Area under Alternate 1).
3. Provide temporary facilities and controls necessary to execute the Work, regulate construction traffic and parking, protect property and the environment, prevent unauthorized entry into areas of active operations, and maintain Owner access to, and normal use of, adjacent facilities and traffic routes.
4. Remove the temporary facilities and controls provided and restore property disturbed during the project.
SUCF Project# 161027
Bid Due: November 17th at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1
Project Manager: Kevin Burnett x6365
Submit Quote to: Quotes@StreeterAssociates.com

Elmira Correctional Facility Replace Oil Tanks and Modify Boiler Controls - IN PROGRESS
Description: GENERAL CONSTRUCTION AND HVAC CONTRACTS. See project documents for details and scope of work.
Bid Due: March 17th, 2021 at 2:00PM
Project Drawings: Download
Project Specifications(General Construction): Download
Project Specifications (Mechanical): Download
Addenda:Addendum 1
Project Manager: Brian Edwards x6359
Submit Quote to: Quotes@StreeterAssociates.com

Replace Doors Hardware Bldg 75 Greater Binghmaton Health Center - IN PROGRESS
Description: See project documents for details and scope of work.
Bid Due: February 24th, 2021 at 2:00PM
Project Drawings: Download
Project Specifications: Download
Addenda:Addendum 1 |Addendum 2 |Addendum 3 |Addendum 4
Project Manager: Mark Stirpe x6357
Submit Quote to: Quotes@StreeterAssociates.com